Preparation of the base under the carpet. Main requirements: - smooth - no defect must be> 7 mm on the 2nd - dry - hard - healthy (ie, without capillary moisture). Scheme for the preparation of foundation: Sweep and vacuum cleaner. Scrape off adhesive residues, etc. Examine the "health" reasons, ie, is there a capillary leak moisture. It is not usually on the floors. She is on the first floor, ie we have the first type of foundation. You must use the epoxy primer. Check availability of capillary water - install condensate in the same place for 3-5 days, eg an inverted jar or sealed film adaptation. Polymerization primer - on wet primer poured sand dries out. Remnants of sand removed. The result - a healthy foundation. Please note: - raise the primer on the plinth level, so that moisture has not moved on the wall - you can not lay on the floor covering, the humidity is more than 3%. Hardness at the concrete base provides self-leveling compound. The role of leveling - a good end of the product, eg, coating. There are two classes nivelirovok: P2 - private rooms, a thin layer of 1 to 4 mm. P3 - for public space, you need a higher compression strength, most adhesion to the substrate, the thickness of 1 to 10mm. If the floor is wood you can prepare for the installation of carpeting in two ways: to lay a whole surface of chipboard, putty the joints, remove all the protruding elements (nail heads, screws), sweeping, vacuuming, apply a special primer on the old boards to remove all protruding elements (hat nails, screws), the surface ottseklevat, primed, apply a self leveling compound for the tree. In areas where work will be carried out, the air temperature, coatings, adhesives and floor should not be below 17 degrees. Bonding of the coating. Bonding coating ensures long life of the coating and prevents damage. Caution: Mounting surfaces should be used only by special adhesives that are sold in a network Decor Service. First segment covers rolled into the room where he should be laid. To cover the segment did not move, it is necessary in some areas to put the cargo. If the coating does not fit into a continuous sheet, with a seam, the seam should be positioned parallel to the incident light. Cover is bent on the wall (3 to 5 cm) and add on to the wall with a sharp knife. After prirezki to the walls and fitting joints (if any), roll half of the leaf surface and apply a coat of adhesive of uniform thickness. Paste coating, laminated to the platen, to avoid formation of air cushions. Attention: it is desirable to produce a complete bonding surface; work with glue, according to the instructions given by the manufacturer at the bank, while paving to close the premises, after the installation and the glue has dried, you need to ventilate the room until the disappearance of a specific smell, coating can be placed on double-sided sticky tape.

No comments:

Post a Comment