Saturday, June 25, 2011

How do peretirku (Update) plaster

Preparatory work before the start of the peretirke walls and ceilings, as well as the manufacture of plastering work, you must perform all work associated with the process of punching and installation to prevent vibration of walls and partitions after the plaster coating. Peretirka plaster made when necessary to eliminate only minor defects, and contamination of the surface of walls and partitions. Peretirka plaster walls and ceilings should be made after the precipitation of plaster construction home. To create a uniform texture of the old and new plaster clean the old paint and then run peretirku walls. Peretirku perform on abundantly wetted surface jointing cracks and sinks in full, their solution flush with the surface, but without prayer. Cracks in the plaster will clear the full depth, clean water and then fill the plastic solution and thoroughly zap. Nabeul the plaster will be removed by scraping with a spatula with a slightly moistened with water surface. Efflorescence formed on the surface of the plaster with water soluble salts contained in the individual bricks together to remove the old plaster. Defects in the plaster in the form of minor damage (scratches, small dents, Dutikow, cracks) correct, removing the old paint and plaster grinding mortar. 2-3 days after peretirki all treated Moisten the surface with a brush used to remove prayers plaster. Roughness, clusters of grains of sand, plaster hardened spatter and other defects on the surface of the plaster will scrape solid brick or butt dry pine bar. Hardened cement splashes can be removed with scrapers. Peretirka plaster used for the repair of materials and quality of finish plaster coating must comply with quality materials and finish plaster repaired. For peretirki surface will apply a fine sifted sand with grain size less than 1 mm. Peretirku carry a wooden float, adding to the local defects mortar. For peretirki use a solution prepared from lime paste and fine sand, sifted through a sieve with holes 1 x 1 mm. Value of lime paste and sand 1: 1. Water was added until a creamy consistency. Places of contiguity of the old plaster with a new front plastering individual sites moistened with water, the surface layer are preserved old primer dent and smachivayut.Shtukaturny solution prepared from powdered quicklime should be applied in one step. After drying, grease on the seats prepared under peretirku and moistened with water wall, causing a thin layer of mortar and grater rubbed in a circular motion. The quality of grouting better if grated cover FELT. Use solutions, with signs of seizure, is not allowed. Svezheoshtukaturennaya surface until the curing must be protected from excessive moisture, extremely rapid natural or artificial drying, freezing, knocks and bumps. The application of lime should exclude the possibility of Dutikow on the plaster surface. Therefore, the lime putty should be allowed to sit 10 - 12 days.

No comments:

Post a Comment